Skip to content

Shingle Roofing

Architectural asphalt shingle roofs with the sealed-deck and six-nail details that keep them on in a storm.

New brown architectural shingle roof on a Hollywood home, finished and swept clean

Shingle is the fastest and most affordable way to put a new, code-compliant roof over your family. The difference between a 12-year shingle roof and a 25-year one is almost entirely in the installation: nail count, starter course, sealed deck and ventilation. We do not cut those corners.

What is included

  • Architectural and designer shingles from GAF, Owens Corning and CertainTeed
  • Six-nail HVHZ fastening pattern on every shingle
  • Sealed roof deck with taped seams for a secondary water barrier
  • Starter strips, ice-and-water at valleys and penetrations, ridge cap
  • Off-ridge or ridge ventilation sized to your attic
  • Manufacturer-backed system warranties where eligible

Why it matters in South Florida

Florida's code requires shingles rated for 130 mph or more in most of our service area, and the HVHZ requires products with a Miami-Dade NOA. A sealed roof deck also earns a wind mitigation credit for a secondary water resistance barrier.

Recent shingle work

Photos from our own jobs, not stock.

New shingle roof and impact windows

One contract, two trades on a single-story Hollywood home: the old shingle roof torn off and replaced with a new architectural shingle system, then every jalousie and single-pane window swapped for impact-rated units.

  • Drone view of the crew stripping the old shingle roof with the old shingles still on the far slope
  • Aerial view of the roof during tear-off, bare decking exposed and new materials staged
  • Crew in safety vests installing underlayment on the stripped roof deck
  • Drone view of the dried-in roof deck with the crew working along the ridge
  • Front of the single-story Hollywood home with scaffolding up during the re-roof
All 24 photos

Shingle and flat roof replacement

Full re-roof of a single-story Lauderhill home: the aged, algae-streaked shingle roof and the flat section over the rear were torn off to the deck and replaced in one job, photographed by drone before, during and after.

  • Drone photo of an aged shingle roof with algae streaking, flat section and pool enclosure before replacement
  • Aerial view of the old shingle roof from the front of the house before tear-off
  • Aerial view of worn shingles and the courtyard side of the house before re-roofing
  • Crew on the roof tearing off old shingles down to the decking
  • Tear-off in progress with new decking and underlayment going down on the pitched slopes
All 9 photos

How it works

  1. 01

    Tear-off

    Old shingles and felt come off and the decking is inspected board by board.

  2. 02

    Seal

    Seams are taped and the deck gets self-adhered underlayment.

  3. 03

    Shingle

    Starter, field, ridge and vents, then a magnet sweep of your yard for nails.

Questions we hear about shingle

How long does a shingle roof last here?

Fifteen to twenty-five years depending on the product, attic ventilation and shade. Sun does more damage than rain.

Can you install over my old shingles?

No. Florida code limits layers and we do not recommend it anyway. A clean deck is the only way to find rot and seal the seams.

How long does the job take?

Most single-family shingle roofs are done in one to two days once the permit is issued.

Free on-site estimate

We inspect, photograph and put the scope in writing. No pressure, no allowances that grow later.

NGS Elite Construction LLC. Florida certified and insured. Serving Miami-Dade, Broward and Palm Beach.

Need shingle work done right?

Tell us about the house. We will inspect, put the scope in writing with the product approvals named, and give you a price you can plan around.