Skip to content

Roof Replacement

Full tear-off and re-roof with permits, inspections and the wind-mitigation paperwork handled for you.

Tear-off in progress: old shingles off, new decking and underlayment going down

A re-roof is one of the biggest checks a homeowner writes. It should come with a clear scope, a real schedule and a roof that passes county inspection the first time. We handle permits, dumpsters, inspections and the wind mitigation report at the end.

What is included

  • Written scope with material, underlayment and fastening spelled out
  • Permit, product approvals and all county inspections
  • Full tear-off to the deck and replacement of rotted wood
  • Choice of tile, metal, shingle or flat systems
  • Daily site cleanup and nail sweep
  • Wind mitigation inspection report for your insurer

Why it matters in South Florida

Insurers in Florida increasingly ask for roof age and condition. A documented new roof with the right attachments can cut premiums and keep a policy from being non-renewed. We give you the permit, final inspection and mitigation report in one package.

Recent re-roof work

Photos from our own jobs, not stock.

White flat tile re-roof on a canal home

Full tile re-roof on a single-story canal-front home in Pompano Beach: the old roof stripped to the deck, the deck dried in, and white flat concrete tile delivered, staged and set course by course to a clean, bright finish.

  • Single-story canal-front home with its old roof before the tile re-roof
  • Crew on the roof during tear-off, dump trailer and trucks in the driveway
  • Old roof stripped and the deck being dried in, crew working toward the ridge
  • Roof debris being cleared off the edge into the trailer below
  • Bundles of white flat concrete tile staged on the roof above the canal
All 9 photos

Red standing seam metal roof

Full re-roof of a single-story Sunrise home with a pool: old roof off, Polyglass self-adhered underlayment dried in, then a terracotta-red standing seam metal roof with concealed fasteners, photographed from the roof and by drone.

  • Polyglass self-adhered underlayment installed over the roof deck before the metal panels
  • Dried-in roof deck with underlayment, seen from the ridge over the neighborhood
  • Underlayment across the main roof and the flat garage section before metal
  • Roof deck covered in underlayment where the two slopes meet
  • Crew on the dried-in roof deck before panel installation
All 17 photos

How it works

  1. 01

    Estimate

    Roof measured, decking checked, options priced in writing.

  2. 02

    Permit

    We pull the permit and schedule inspections around your calendar.

  3. 03

    Build

    Tear-off, dry-in, finish roof, final inspection, paperwork delivered.

Questions we hear about re-roof

How long does a replacement take?

Shingle: one to two days. Metal: two to four days. Tile: one to two weeks including tile set and cure.

Do I need to be home?

Only for the first morning and the walk-through at the end.

Do you offer financing?

Yes. See our financing page for current programs, including options for the My Safe Florida Home grant.

Free on-site estimate

We inspect, photograph and put the scope in writing. No pressure, no allowances that grow later.

NGS Elite Construction LLC. Florida certified and insured. Serving Miami-Dade, Broward and Palm Beach.

Need re-roof work done right?

Tell us about the house. We will inspect, put the scope in writing with the product approvals named, and give you a price you can plan around.